What we do, and what we don’t
We handle the electricity contract side of an EV charger: contracted power, tariff, and the paperwork with the distributor and the supplier. The charger itself is fitted by an authorised installer; we work alongside them so that the contract matches the installation.
How much power a charger needs
| Charger | Power | Supply |
|---|---|---|
| Standard socket, slow | 2.3 kW | Single-phase |
| Wallbox 16 A | 3.7 kW | Single-phase |
| Wallbox 32 A | 7.4 kW | Single-phase |
| Wallbox 16 A | 11 kW | Three-phase |
| Wallbox 32 A | 22 kW | Three-phase |
Most homes in Spain have a single-phase supply, so a 3.7 or 7.4 kW wallbox is the usual choice. Three-phase chargers (11 and 22 kW) need a three-phase supply.
Choosing the contracted power
The charger adds to everything else running in the home. If your home peaks at 4.6 kW and you add a 3.7 kW charger, the worst case is 8.3 kW, and the meter cuts the supply above your contracted power. There are two ways to deal with it:
- Raise the contracted power to cover both. Simple, but you pay for every extra kW every day.
- Use a charger with load management. It lowers its current automatically when the rest of the home needs power, so you can often raise the contract by much less.
We look at your real consumption peaks and the charger you plan to buy, then suggest the lowest power that works.
Day power and night power
On the 2.0TD tariff, power is set separately for day (P1) and for night and weekends (P2). If you charge overnight, you can raise only P2 and leave P1 as it is, which keeps the fixed cost down. More on the hours in our guide punta, llano and valle.
A tariff for night charging
Energy in the valle period (00:00–08:00 and all weekend) is the cheapest, so charging then makes a big difference to the cost of each kilometre. We compare tariffs with different night prices and PVPC using your own consumption, and choose the one that is cheapest overall, not only at night.
Which case is yours
- Your own home with its own meter: usually a change of contracted power, sometimes with a new electrical certificate (CIE).
- A garage in a community building: the charger may be wired to your home meter or to a separate supply for the garage, which is a new connection. The building’s installation and the community’s rules decide which.
- A new build or a plot: the charger is planned together with the supply from the start.
How it works
- You send your latest bill, the charger model (or the installer’s quote) and where it will be fitted.
- We calculate the power and the tariff, and tell you the distributor’s fees in advance.
- We arrange the change of power or the connection and, if needed, a new tariff.
- After the first bill with the charger, we check that everything is as agreed.
Rules for charging points in buildings and the fees charged for a power change depend on the building and the distributor. We confirm both for your address before you decide.