You switched on the oven, the kettle and the washing machine, and the lights went out. That means you exceeded the contracted power in your contract. Here is what to do at that moment and how to tell whether you need more power.
Why it trips
A digital meter monitors the power you are using at once. If it exceeds the contracted power, the meter cuts the supply. This is not a fault or a wiring defect: it is how the limit in your contract works.
If it is the circuit breaker in your flat’s fuse box that trips (rather than the meter), and the load is small, it may be a faulty appliance or wiring. Then you need an electrician, not more contracted power.
What to do straight away
- Switch off one or two high-power appliances: the oven, hob, water heater or air conditioner.
- With many digital meters the supply comes back automatically after a while. On some you need to press a button on the meter, which is usually labelled.
- If the supply does not return, check the breakers in your flat’s fuse box.
How to work out how much power you need
Add up the power of the appliances that actually run at once at your busiest moment. Typical figures: oven 2–3 kW, induction hob with all rings on up to 7 kW, washing machine while heating about 2 kW, water heater 1.5–2 kW, air conditioner about 1–1.5 kW per unit. A table of appliances is on the page about changing contracted power.
The most accurate way is to look at the maximum power your meter records. The distributor holds this data, and we analyse it for clients.
Raise the power or change habits?
You pay for each additional kilowatt of power every day all year. So first check whether the load can be spread over time:
- run the washing machine and dishwasher on a delayed start;
- heat the water heater on a timer at night;
- do not run the oven and hob at full power together with the air conditioners.
If it trips regularly and without an obvious overload, for example after installing air conditioning, an induction hob or an electric-car charger, raising the power is worthwhile. Sometimes it is enough to raise it only for the night period P2.
What an increase costs
The distributor charges regulated fees for each kilowatt added, and if the new power is above what your installation allows, you will need an electrical certificate (CIE). We calculate all the costs in advance and choose a value at which it neither trips nor overpays. Send a request or message us on WhatsApp.